The project consisted of replacing one 1000 ton cooling tower and one 85 ton evaporative cooler during the winter of 2013. All piping, roofing, controls, insulation, structural, and engineering were part of our scope of work. This project also applied for energy grants through OPA ‘Save on Energy’ program.

0