This design/build project was handled in stages to maintain redundancy of heating and steam systems. The existing Cleaver Brooks plant was replaced with approximately 400HP altogether. (2) two hundred HP boilers were replaced under the first phase. The second phase had both 100HP steam boilers for humidification and process related separately.